Fulton County, Indiana
Fulton County is focused on creating a prosperous future while preserving our history.
Road Cut General Guidelines
Road Cut General Guidelines
1. Saw cut trench width plus 6 inches on each side.
2. Bed in underground device with #8 crushed gravel in 1 foot lifts.
3. 12 inches of #73 (gravel or limestone) compacted to within finished asphalt grade.
4. If existing asphalt road is 4 inches or more, restore using #8 Binder HAC to within 1 1/2 inches to top of existing blacktop and roll and compact to finish. Finish with #11 HAC surface to be matched into existing pavement.
5. If existing asphalt road is less than 4 inches, restore road bed with 2 1/2 inches #8 HAC Binder to within 1 1/2 inches of existing top of road and finish with #11 HAC surface to be matched into existing pavement.
6. Road cuts must be approved by Fulton County Highway Department with a waiver.
7. Application must provide traffic control during road cut.
Contact Us
In this Department
- Department Home
- About the FCPC
- County Board of Finance
- Personnel
- Administration
- About Our Office
- Drainage Board
- Local Court Rules
- Environmental Health
- Local Court Rules
- Alcohol & Drug Court Program
- Friends of the Park
- ADA
- Advisory Board
- Court Forms
- Online Permitting and Board Applications
- Ordinances Enforced by the F.C.P.C.
- Legal Resources
- Communication Board Members
- Road Patrol
- Fulton County Dispatchers
- Recorder Requirements
- Park Board Members
- Community Corrections
- Food Protection
- Investigations
- Area Plan Commission Meetings, Agendas, & Packets
- Vector Control & Tobacco Regulations
- Fulton County BZA Meetings, Agendas, & Packets
- Court Forms
- Jail Division
- K - 9 Unit
- Vital Records
- Public Nursing
- Rochester BZA Meetings, Agendas, & Packets
- Akron BZA Meetings, Agendas, & Packets
- Narcotics Investigations
- Court Security
- Fulton/Kewanna BZA Meetings, Agendas, & Packets
- F.C. Comp Plan Update